Pre-bid checklist for a Washington plumbing contractor

What should a Washington plumbing contractor check before bidding a job?

Before you advertise or bid

Confirm the license is issued, not pending. Advertising, offering to do work and bidding all count as acts under the plumbing chapter.

Check three dates: the bond, the liability policy and the designated plumber's certificate. Any one lapsing suspends or undermines the license.

Confirm that the name on the ad, the bid and the invoice matches the name on the license, since a name change means relicensing. See the license sequence.

Advertising, offering to do work and submitting a bid in violation are each infractions, counted per day. — Washington State Legislature, RCW 18.106.020, retrieved 2026-09-29

Before you assign the crew

Name the certified plumber on the job. Check that each helper holds a trainee card, a permit or a certificate.

Count trainees against the ratio for that jobsite type, and plan for the supervisor to be on site at least 75 percent of the day. Medical gas work needs a journey level plumber with the endorsement.

The limits are in the trainee rules. Write the crew list on the job sheet, so the person who authorized the assignment is on record.

75 percentA supervisor must be on the same jobsite as the trainee for at least 75 percent of each working day, unless otherwise provided. — Washington State Legislature, RCW 18.106.070, retrieved 2026-09-29

Before you subcontract any part of the job

Look up the sub's contractor license before you sign. The rule bars a licensed contractor from using anyone unlicensed for covered work.

Ask the sub for the bond and insurance certificates. Write the license number into the subcontract.

If the sub is a specialty shop, such as backflow testing or pumping, confirm that its certificate covers the scope you are handing over.

It is unlawful for anyone required to be licensed to subcontract to or use anyone not licensed for work covered by the chapter. — Washington State Legislature, RCW 18.106.020, retrieved 2026-09-29

Before you send the invoice

Check whether you are a prime contractor or a subcontractor on this job. A prime contractor collects retail sales tax on the full contract price.

A subcontractor invoices under wholesaling and does not collect it. See the tax page for the rule.

Then close the loop today: file the completed job sheet with the license number, the crew list and the invoice, so the whole file sits in one folder.

Prime contractors must collect retail sales tax measured by the full contract price, and subcontractors are taxed under wholesaling. — Washington State Legislature, WAC 458-20-170, retrieved 2026-09-29

Questions

Do I need the checklist for repair calls too?

Yes. A repair call is plumbing work. The license, the certificate and the ratio rules apply to it, and each worksite counts separately if something is out of order.

How often should I re-run the date checks?

Check the bond, policy and certificate dates monthly, and again before each bid. A lapse can suspend the license automatically, so a monthly check is cheap insurance against working on a suspended license.

Who keeps the checklist?

Whoever authorizes work assignments. The statute allows a notice of infraction to reach that employee personally, so it makes sense for that person to own the list.